Sidoktaya 8 April
A team led by MP U Kyaw Aung Lwin of Pyithu Hlttaw and Township Administrator U Zaw Min Naing inspected the construction of Kyaukaue Creek Bridge on Padan-Ngape-Sidoktaya-Bu-Laungshe road in Sidoktaya Township, Minbu District, Magway Region this morning.

First, Assistant Engineer U Kyi Min clarified the salient points of the project. The bridge is being constructed with K 756 million allocated in 2018-2019 FY and the construction started on 5 December 2018. The bridge which is 280 ft in length and 31 ft in width will be completed before monsoon. Vehicles with a maximum legal capacity of 60 tons will have access to the bridge.
Si Thu Lwin (IPRD)
Translated by Suyee