Leiktho, 22 June
With the aim of ensuring swift flow of commodity and saving time and money, construction work of a concrete road linking to B.E.H.S. and Taungoo-Leiktho-Loikaw road has been implemented since the first week of June this year in ward-3 in the town of Leiktho, Thandaunggyi Township of Kayin State and now, all the projects have been completed by 100 percent.
The concrete road measuring 260 ft. in length, 10 ft. width and six inches thickness was constructed by the Township Development Committee with Ks. 9.5 million allotted by Kayin State government in 2023-2024 FY.—Khin Lay Nwe(IPRD)
Translated by JT


