UNION Minister for Elec­tric Power U Nyan Tun, ac­companied by departmental officials, inspected the power distribution processes of the Namsang main power substa­tion in Namsang Township on 16 June.

 

During the inspection, the Union minister instructed those responsible to ensure continuous power supply at full voltage, reduce power outages and losses, conduct maintenance on electrical de­vices, transformers and power lines and regular maintenance works.

 

At noon, the Union minis­ter met the state, district and township-level electrical engi­neers and staff at the township electrical engineer’s office in Taunggyi Township.

 

The Union minister heard the reports regarding the pow­er supply, electricity bill collec­tion, completed work processes in the 2024-2025 financial year, work plans for the 2025-2026 financial year, measures to re­duce power losses and outages, reconstruction of power grids and power sub-stations after the earthquake in Inlay region and electrification processes.

 

He then pointed out the need to reduce power losses, reduce electricity bill debts and supervise the illegal use of electricity. He also cordially met staff and presented cash to them. — MNA/KTZH