Kyaukdaga, 4 November


An inauguration of a rural electrification facility was held in Kywetehyi Village, Kyaukdaga Township on 3 November.


Kywetegyi Village consists of 64 homes and is located in the National Grid area. The electrification structure was built on a self-reliant basis. The facility was opened by a regional lawmaker, Township Administrator U Win Zaw Htwe and representatives from a private construction company by cutting a ceremonial ribbon. Next, the regional MP, and an official from the Electricity Supply Enterprise gave speeches.


The structure was built under the National Electrification Plan (NEP) in the township. A local farmer named U Hla Myint is delighted to access to electricity, expressing his gratitude to concerned officials.


Bo Thein
Translate by Kyaw Htike Soe