The construction of Thanlyin Bridge-3 connecting between Thanlyin and Thakayta townships in Yangon Region and crossing the Bago River is about 83 per cent complete on Thakayta side (Package-3), and the construction works in the remaining Package 1 and 2 are being carried out.